CSO 1/23/2019 Estimated Discharged 3,000 Gallons

Mon, January 2019 14:15:32 +0000 (UTC) Ended: 7:39pm A combined sewer overflow event occurred in the City of Butler at Outfall 003 into Big Run Ditch. There are no affected public access areas. This event is no longer continuing at the time of this notification. CSO Permittee: Brian Moore 260-927-5270

CSO 1/23/2019 Estimated Discharged 3,000 Gallons

|| January 23, 2019

Mon, 31 Dec 2018 15:09:32 +0000 (UTC)
A combined sewer overflow event occured in the City of Butler at Outfall 003 into Big Run Ditch. There are no affected public access areas. 
This event is no longer continuing at the time of this notification.
CSO Permitee: Brian Moore 260-927-5270

© Copyright 2019 City of Butler. All rights reserved.