Date Ended 3/19/2020 Time Ended 8:55 pm Gallons Discharged 117.387 2

, A combined sewer overflow event occurred in the City of Butler at Outfall 003 into Big Run Ditch. There are no affected public access areas. This event is no longer continuing at the time of this notification. CSO Permittee: Brian Moore 260-927-5270

Date Ended 3/19/2020 Time Ended 8:55 pm Gallons Discharged 117.387 2

|| March 25, 2020

Mon, 31 Dec 2018 15:09:32 +0000 (UTC)
A combined sewer overflow event occured in the City of Butler at Outfall 003 into Big Run Ditch. There are no affected public access areas. 
This event is no longer continuing at the time of this notification.
CSO Permitee: Brian Moore 260-927-5270

© Copyright 2020 City of Butler, Indiana. All rights reserved.